WazirX has been directed by the Singapore High Court to complete some more documentation work before giving it the go-ahead to implement its restructuring scheme. For now, the Singapore court has extended its moratorium cover to WazirX and Zettai to 6 June.
Tech
WazirX Reimbursement Plan Faces Delay as Singapore Court Extends Existing Moratorium to June 6
by aweeincm1

Recent Post

Caught On Camera, Stray Bull Lifts, Drags And Tramples Man in Delhi
A stray bull attacked a man standing by the roadside ... Read more

Travelling Through Tunnels: The Udhampur-Srinagar-Baramulla Rail Link
Of the 272 km long Udhampur-Srinagar-Baramulla rail route, about 119 ... Read more

Top RCB Official Among 4 Arrested By Bengaluru Cops Over Deadly Stampede
The Bengaluru police have made four arrests over the stampede ... Read more

Want To Study At Oxford? Get Up To Rs 22.9 Lakh Through This Scholarship
The standard duration of the scholarship is two years, with ... Read more